Skip to main content

Pawling Central School District

CAPITAL PROJECT

Pawling Central School District

CAPITAL PROJECT

  • Client
    Pawling Central School District
  • Location
    Pawling, NY
  • Scope
    STEAM Classrooms, Music, Athletics, Food Service, Agriculture and Food Science, Library/Media Center, Health and Safety, Infrastructure and Site Improvements
  • Completion Date
    Spring 2025

The multi-phased capital project will also address high priority infrastructure upgrades that were identified in the district’s most recent Building Condition Survey, including site and parking improvements, HVAC system upgrades, plumbing, electrical and lighting improvements, and a roof replacement at Pawling Middle School. CSArch is working with Energia to develop an Energy Performance Contract that will fund $1.9 million in energy efficiency and critical infrastructure improvements. To support an increased outdoor seating capacity during athletic events, a new parking lot will provide 80 spaces between the middle and high school.

"CSArch has worked collaboratively and strategically to help our district move toward bringing the best designed and most cost-effective projects before our voters.”

Kim Fontana, Superintendent at Pawling CSD

High School

STEAM Programming

STEAM learning is an important aspect of the project to support the district's desired program. To place a greater focus on STEAM, a new technology addition at the high school creates an integrated woodshop and computer design lab, allowing students to engage in hands-on learning from design through fabrication.

Courtyard

We designed a welcoming outdoor courtyard where students can eat lunch, socialize, and enjoy time between classes. With seating areas and thoughtful landscaping, the space encourages connection in a comfortable, open-air setting.

Athletic Field

Phase 1 of the project, completed in 2023, constructed a multi-purpose athletic field, running track, bleachers, and press box. The field was designed with a synthetic turf surface for easy maintenance, extended use, and enhanced safety.

Cafeteria

The existing woodshop has been relocated to make way for a two-tiered cafeteria and servery lline with access to an outdoor dining area, concession window, and mobile serving line for outdoor events. 

Music

The high school cafeteria has been renovated into a new band room with increased instrument lockers, general storage, office space, and practice rooms. Renovations to the existing music room will provide an enlarged space dedicated for choral instruction. 

Elementary School & Middle School

Library Media Center

The elementary school library has been relocated to provide direct access to a new outdoor courtyard. A variety of fixed, mobile, and soft seating, faux tree ceiling clouds, and an expanded English as a New Language (ENL) classroom located next to the space supports an inspiring, flexible environment for young learners.

Secure Entrance and Main Office

A new main entrance and enclosed secure vestibule addition will allow office staff to safely screen visitors and control entry into the building. The existing library will be renovated into a new main office and nurse's suite, which will centralize support services and limit visitor access to the front of the building.

Food Science and Agriculture

The food science and agriculture classrooms at the middle school will be renovated and expanded to integrate new student opporunities, including a working greenhouse, proper plant growth systems, and visual connectivity between spaces to support a true farm-to-table learning environment.

Building brighter futures for our clients.

At CSArch, we deliver high-quality, specialized, multi-disciplinary service across architecture, engineering, interior design, and construction management. We’re able to assist with a wide range of building types and projects, so whether you need us to work on a school, firehouse, laboratory, or corporate building, we’re here to help.

List All Projects